Updates
OTHER
Moddex
The $1.75 billion Regional Rail Revival program – a joint initiative of the Australian and Victorian governments – includes upgrading every regional passenger train line in Victoria.
OTHER
Moddex
Flexibility is one of the key factors behind Moddex being selected to provide barrier systems for the $80m Pukekohe Wastewater Treatment Plant upgrade.
NEWS
Cora Bike Rack
A recent Danish study has observed that the riders who most fear crashes are those that have never crashed.
NEWS
Cora Bike Rack
Creating bike friendly cities and great cycling infrastructure is key for Australia to reach its goal of zero emissions by 2050.
OTHER
Moddex
With non-residential and infrastructure construction in New Zealand forecast to increase over the next two years, this signals busy times ahead for architects, engineers and project managers.
OTHER
Moddex
As an architect or specifier, you’re looking for compliant handrail and balustrade systems that are functional and easy to specify.
PROJECT CASE STUDIES
Moddex
Moddex customised handrail and balustrades configurations make self-installation easy. That’s why Waterway Constructions – our client on the $70m Guyatt Ferry Terminal upgrade – came to us to supply preconfigured handrails and balustrades.
OTHER
Moddex
As noted in NZBC Clause D1 Access Routes, accessible stairways and accessible ramps shall have handrails provided on both sides of accessible stairways and on both sides of accessible ramps where the ramp slope is steeper than 1 in 20.
OTHER
Moddex
With busy times ahead for architects, engineers and project managers in non-residential and infrastructure construction, Moddex NZ delivers modular, no-weld, pre-engineered and compliant handrail
OTHER
Moddex
Unforeseen modification needs come up regularly onsite. The question is, is your barrier system designed to cope?