Moddex
Moddex is a world leader in commercial and industrial handrail and balustrade systems because it has developed a system that ensures everything fits™.
OTHER
Moddex
Under NZBC Clause D1 (Access Routes), the width between handrails on an accessible stairway or between handrail and wall on a common stairway shall be no less than 900 mm.
PROJECT CASE STUDIES
Moddex
In accordance with AS1428.1-2009 Clause 11.1 (b), stairs that intersect at an internal corridor shall be set back in accordance with Figure 26(B), as shown below.
OTHER
Moddex
Full compliance with the requisite industry standards for handrails and balustrade systems on any project is, of course, non-negotiable.
OTHER
Moddex
When choosing a supplier for a large project there are numerous factors to consider. Here’s how Moddex stands out.
PROJECT CASE STUDIES
Moddex
The Christchurch earthquake which destroyed much of the city’s key infrastructure, also ruined many popular, well-used sporting facilities. As part of the massive rebuild Christchurch City Council built the new Nga Puna Wai Sports Hub in Wigram.
PROJECT CASE STUDIES
Moddex
Under NZBC Clause F4 (Safety from Falling), barriers must have a minimum height as detailed in Table 1.
OTHER
Moddex
From the beginning of your customer journey with Moddex, we strive to deliver an epic experience. We do this by providing an industry-leading level of service from concept to installation that our competitors cannot match.
PROJECT CASE STUDIES
Moddex
A large infrastructure project always has its complexities and the $1.6 billion Caulfield to Dandenong Level Crossing Removal (Skyrail) was no different.
PROJECT CASE STUDIES
Moddex
Following an incident at a Victorian school, the Victorian School Building Authority found it necessary to undertake a Safety in Design review of balustrades in new school buildings.