135 results for "school" in Articles
PROJECT CASE STUDIES
4 MONTHS AGO
Bildspec Create Innovative Learning Environments at Ku-ring-gai High School
PROJECT CASE STUDIES
5 MONTHS AGO
Woogaroo Creek State School in southeast QLD is a state-of-the-art facility that opened for Prep to Year 6 students in January 2023.
PROJECT CASE STUDIES
5 MONTHS AGO
Victoria Point State High School's modern two-story technologies block has been constructed, employing Delta Panels for the sheltered walkway.
NEWS
5 MONTHS AGO
Embrace the back-to-school season with confidence and ease by incorporating some of Merlin’s smart solutions into your routine.
PROJECT CASE STUDIES
5 MONTHS AGO
MAC Interlocking Panel formed an integral part of this award winning Senior High School, incorporating a stunning mix of matt finish Colorbond® colours with variable width panels.
PROJECT CASE STUDIES
5 MONTHS AGO
Albany Senior High School (ASHS) celebrated the official opening of the Performing Arts Centre (APAC) in 2023.
NEWS
5 MONTHS AGO
Transforming outdoor spaces for our students' well-being with innovative shade solutions is our top priority at KOEDN®.
PROJECT CASE STUDIES
5 MONTHS AGO
Melbourne’s Chelsea Heights Primary School utilised Bildspec's Operable Walls as part of their prestigious school upgrade, giving their space a massive step up.
PROJECT CASE STUDIES
5 MONTHS AGO
Bildspec Operable Walls Deliver on its Promise of Exceptional Customer Service
PROJECT CASE STUDIES
5 MONTHS AGO
Caribou Lighting are very proud to have supplied the lighting for the new vertical State Secondary College in Fortitude Valley.
PROJECT CASE STUDIES
5 MONTHS AGO
Our innovative drainage system ensures game days aren't rained out. With Atlantis® Drainage Cell, we're keeping fields dry and green all season long.
PROJECT CASE STUDIES
6 MONTHS AGO
Fairview supplied 918m2 of Genesis pre-finished compressed fibre cement 'Raw' panels in the colour Limestone for the new multi-purpose sports and performing arts hall at the Oakey State High School, QLD.
PROJECT CASE STUDIES
6 MONTHS AGO
The SHORE School in North Sydney contacted Acculine late 2021 for a solution for the walls of their gym that were suffering extensive damage from weightlifting and exercise equipment.
PROJECT CASE STUDIES
6 MONTHS AGO
Nukemea Primary School marks an exciting milestone for education in the vibrant community of Orewa. With keen foresight, the Ministry of Education recognized the need for expanded educational facilities to accommodate for the rapidly growing Orewa area, 30 minutes north of Auckland City.
PROJECT CASE STUDIES
7 MONTHS AGO
Responding to rapid growth in the Gungahlin region in the ACT, the new Shirley Smith High School has been built in the suburb of Kenny; opening its doors to students this year.
PROJECT CASE STUDIES
8 MONTHS AGO
The work at Fielding High School involved improving access to the school through the installation of ramps and handrails to enhance accessibility and safety for all students, staff, and visitors.
NEWS
8 MONTHS AGO
We're thrilled to share that we've reached Gold status with the Supply Chain Sustainability School (SCSS)!
PROJECT CASE STUDIES
8 MONTHS AGO
The $12.4 million new classroom block at Cambridge High School stood as an exciting and much-needed project constructed by Livingstone Builders.
PROJECT
8 MONTHS AGO
While ensuring safety and compliance at height were undoubtedly crucial aspects of the Cambridge High School project, aesthetics also held significant importance.
PROJECT CASE STUDIES
8 MONTHS AGO
As a part of Victoria’s largest-ever single investment in upgrading specialist schools, Nelson Park School in Bell Park, Geelong was one of 39 specialist schools to share $388.8 million in 2020-21.
PROJECT CASE STUDIES
11 MONTHS AGO
An impressive build, featuring an array of our custom roofing, walling and rainwater products.
PROJECT CASE STUDIES
11 MONTHS AGO
Transforming Ashfield Boys High School's sports field with the Atlantis SPORTSDRY system! From efficient drainage during heavy rainfall to storing water for dry periods! This system ensures a perfect playing surface all year round.
PROJECT CASE STUDIES
1 YEAR AGO
The project had several requirements and challenges which we have been able to successfully meet.
NEWS
1 YEAR AGO
Studies have shown that the temperature of a learning environment has a direct impact on a student's ability to learn and retain information. In Australia, a large portion of the year is spent in warmer conditions, signifying the importance of having an effective cooling system in schools.