We in the installation of ceramic tile preparation process, the construction workers would tell us to prepare the material . There are many kinds of materials, one of which must be emphasized by workers, saying that to prevent the surface of the tiles from being too smooth, the interface is not sticky and easy to fall off. It is necessary to buy a material interface agent for ceramic tiles . This material is unfamiliar to most of us.
What is the tile interface agent
Interface agent is a kind of adhesive, general use in concrete exterior , we all know, the wall bottom looks too smooth, let the paste when the tiles fall naturally worried questions, through the use of this product can make our wall underlying appearance It becomes rough, adds its adhesive force, and prevents the plaster layer from bulging.
Tile interface agent has permeability, adhesion, resistance to water , air permeability and weathering function, may be formed between the bottom reticulation system, to solve the fault between the hollowing, such as falling quality questions. Suitable concrete, aerated concrete, small block, light partition, brick walls, putty underlying interface Scraping, tile adhesive, masonry and insulation sheet-backed pre-like process .
Tile interface agent using attention matters
1. The construction environment must be dry, the relative humidity should be less than 70%, and the ventilation is outstanding. The temperature of the base surface and the environment should not be lower than + 5 ℃.
2. Preparation of base surface: The base surface should be clean, not loose, no dust, grease, moss, carpet glue, etc. should be shoveled away, loose and cracked parts should be chiseled and repaired in advance .
3. Mixing: add 10 liters of water (water: powder = 0.5: 1) to each bag of powder (20 kg), which must be mixed with electric equipment and mixed into a uniform thin slurry.
4. Brushing and boring: Use a roller or a brush to brush the slurry onto the base surface without brushing, and then let the coated surface dry (about 12 hours).
5. Maintenance and product maintenance: Ventilation must be strengthened, and natural maintenance can be done. After the slurry is dried (the surface becomes gray and black) and the base surface is completely closed, the subsequent process can be started.
6. Cleaning of things: The solidified slurry is difficult to remove. After use, it should be cleaned and cleaned with water as soon as possible.