The Global Head Office for ANZ required an Air Tight access floor system with smoke and zone baffling. Due to the design of the mechanical units, the specification required each zone to be tested to comply with a controlled air leakage rate of 0.7277l/s.m² without floor coverings.
The Global Head Office for ANZ required an Air Tight access floor system with smoke and zone baffling. Due to the design of the mechanical units, the specification required each zone to be tested to comply with a controlled air leakage rate of 0.7277l/s.m² without floor coverings.
The Global Head Office for ANZ required an Air Tight access floor system with smoke and zone baffling. Due to the design of the mechanical units, the specification required each zone to be tested to comply with a controlled air leakage rate of 0.7277l/s.m² without floor coverings.