- Australia
Copyright © 2024 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
ASSA ABLOY Entrance Systems provided a complete solution, both products and maintenance, for docking stations at DHL’s new logistics center at Budapest Airport, Hungary.
DHL was constructing a brand-new logistics center at Budapest Airport to handle its rapidly-growing volume of shipments.
More than 50,000 of less than truckload shipments and more than 33,000 full truckload shipments would be handled per annum. The new facility thus needed 41 docking stations for loading and unloading as well as additional doors.
ASSA ABLOY Entrance Systems distributor Crawford-Hungary Kft provided a solution to equip the logistics center with 41 complete docking stations, including 37 Crawford standard levelers, 4 pieces of Crawford Jumbo levelers, dock shelters and Crawford 542 overhead sectional doors. In addition to the docking bays, there are a further 7 Crawford 542 overhead sectional doors operating in the facility.
The products contributed to a complete solution including the installation of the pits and frames, in addition to the installation of the Crawford overhead sectional doors, levelers and shelters.
The agreement also included a long-lasting partnership with the customer including a maintenance contract.
Download the PDF Project Sheet