- Australia
Copyright © 2024 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
Faced with an increasing number of students and staff cycling to campus everyday, FDC Construction was tasked with finding a solution to increase bike parking capacity within the limited parking areas available at Macquarie University latest building project.
Using Cora Bike Rack’s fully dynamic E3DT-GT double-tier system, FDC was able to increase the number of secure AS2890.3-compliant bike parking spaces by 120%.
With a dynamic gas-lift assist upper tier together with a dynamic lower tier, the E3DT-GT allows the use of reduced spacing between racks while still complying with AS2890.3 requirements. Other double-tier systems that use a static lower tier must still adhere to larger spacing requirements, resulting in fewer bike parking spaces in a given area.
Watch this video of the installation:
Macquarie University EOT by Cora Bike Rack