- Australia
Copyright © 2024 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
The Victoria's Big Build level Crossing removal project consists of the removal of 110 dangerous and congested level crossings across Melbourne by 2030, the largest project of its kind in Victoria's history. As part of this project, a new updated elevated station with new open space areas, bus interchanges and safer walking and cycling connections has been completed at the Mooroolbark’s station!
EQUITONE [lines] through-coloured fibre cement panels perfectly suited the brief of connecting the history and surrounding to the infrastructure, with the earthy tone and texture of the fibre cement panels.
Equitone through-coloured facade panels influence aesthetics, durability, and sustainability!
Request your sample: https://lnkd.in/g37wKrGq
Architect: BKK Architects
Builder: John Holland
Installer: Casello
Product: Equitone by Etex
Photo credit: EQUITONE ANZ