- Australia
Copyright © 2025 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
2 years after starting work at Adina Hotel in George St, Dunsteel have successfully completed our works. It was great to be working again with the team at TOGA. Its satisfying seeing the final results and the culmination of all the hard work by our team and all the trades that were involved in the project.
Our works included the design, supply and installation of the feature stair located on Level 21 in the hotel lobby, the structural steel fabrication and installation of the crown steelwork from Levels 21 to 25, and all the supporting steelwork for the water feature and stone on the ground floor. One of the big challenges we faced on this project was the logistics of getting the crown steelwork into Sydney CBD but, as always, with meticulous planning and hard work we get this impressive end result.