- Australia
Copyright © 2024 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
Interview with Darryn Fenton - Construction Manager for Papakura Water Treatment Plant
The initial design for the admin building where operations will take place was designed and detailed with normal timber ramp with temper files with an advantage of using easy built concrete slab walk way and ramp. Moddex was able to build in two days.
https://youtu.be/wew1z_cOK2I