LOCATION: Rotorua, NZ
CLIENT: Foster Construction
INDUSTRY: Commercial
PRODUCTS USED: Assistrail® - Disability Handrails
AR30, AR40
Foster Construction were contracted to construct an entrance at the Rotorua Pak n Save Click & Collect point.
Being a public area, it was important that the entrance was constructed within a short timeframe to ensure the work was conducted with little disruption to the public as possible.
Foster Construction contacted Moddex with a need for a full ramp and handrail solution. Our off-site manufactured Ezibilt Ramp and Stair System was the obvious solution. The great advantage of the Ezibilt system, is that it is manufactured off-site and installable with simple tools, which not only ticked the boxes for a massive time saver on site, but could guarantee compliance to regulatory standards.
Typical timber ramps can take up to 3 weeks to construct, including council inspections in between and the need for fairly skilled labour to build. With the Moddex Ezibilt system, we could offer the following benefits to our client:
This brought significant time saving efficiencies on site with install being completed within 3 days. The end result was a fully compliant, fit-for-purpose ramp solution â not to mention a happy client!
Products Used
AR30
Single Inline Handrail | Midrail. For stairs and level applications under one metre (FFL) & midrail for extra protection
AR40
Single Inline Handrail | Midrail & Kerbrail. For disabled ramps under one metre (FFL) and midrail for extra protection