- Australia
Copyright © 2024 Powered by BCI Media Group Pty Ltd
Confirm Submission
Are you sure want to adding all Products to your Library?
Contact Detail
This project encompassed four new levels built on top of the existing Catherine McAuley Centre. The new expansion will deliver an extra 64 inpatient beds, which includes eight new critical care beds, as well as six new operating theatres at a cost of $85 million. Others involved in the redevlopment included the head contractor Multiplex and the hydraulic package was professionally done by Geschke Plumbing.
Stoddart proudly manufactured and supplied 6 custom designed surgical scrub troughs, and more than a dozen dirty utility flushing rim sink benches, clean room benching, floor mounted cleaners sinks and wall shelving.