This project involved the construction of 538 nos of bored piles, secant bored piles, contiguous bored piles & king post with diameter ranging from 600mm to 1100mm diameter.
The most challenging part for this project is the construction of the piling work within the MRT reserve line with some secant bored piles were directly above the MRT Tunnel Box.
This project involved the construction of 538 nos of bored piles, secant bored piles, contiguous bored piles & king post with diameter ranging from 600mm to 1100mm diameter.
The most challenging part for this project is the construction of the piling work within the MRT reserve line with some secant bored piles were directly above the MRT Tunnel Box.
This project involved the construction of 538 nos of bored piles, secant bored piles, contiguous bored piles & king post with diameter ranging from 600mm to 1100mm diameter.
The most challenging part for this project is the construction of the piling work within the MRT reserve line with some secant bored piles were directly above the MRT Tunnel Box.