The Village by Scalabrini
Over a period of four years, product specialists and executive management at HLS Healthcare worked closely with Scalabrini to design, implement, and commission a large-scale living assistance project that will revolutionise how residents are looked after in aged care facilities.
Todd MacRae, NSW Product Specialist at HLS Healthcare, Nick Stehr, Managing Director at HLS Healthcare, Hansen Yuncken, and Scalabrini worked collaboratively over the lifetime of the project, which is now fully deployed. What started as a general inquiry from Hansen Yuncken developed into a full-scale implementation of both Guldmann Ceiling Hoist and Elsi Smart Floor technologies.
Once the proof of concept was made clear with a prototype room installation of the two systems, the full rollout of 127 rooms was approved and executed between April 2017 and February 2018.
Programmable smart floors that discreetly monitor movements and detect falls, along with ceiling hoists that aim to ensure the comfort and safety of residents are among the assistive technologies incorporated into all bedrooms at Scalabrini Village’s newest facility in Drummoyne, Sydney.
"The assistive technology helps the environment to adapt to the differing and changing abilities of residents", says Elaine Griffin, CEO of Scalabrini.
The sensor floor within each bedroom, for example, is programmed according to the clinically assessed needs of individuals.
“We are aware of a resident’s capability and how best to support them. The floor can be programmed accordingly so we can ensure we are not being intrusive, interrupting, or disturbing their privacy unnecessarily. That freedom, privacy, and dignity is important to us.” Griffin tells the Australian Ageing Agenda.
PROJECT DETAILS
Address: Drummoyne, Sydney
Property Type: Other Residential
Design Style: Minimalist, Modern
Project Duration: 11 months
Year Finished: 2018
To find out more about HLS Healthcare, head to their Archify page.
Information sourced from HLS Healthcare