The emco installation frame 500 consists of angled profiles with mitred corners. The sturdy gusset plates supplied ensure a screw connection that is true to size. The scope of delivery includes wall anchors. The frame is supplied either ready for assembly or preassembled (e.g. in the case of frames with curved sections or several sections, etc.).
Installation guide:
The frame (1) must be flush with both
the screed (2) in the mat well and the
floor covering (3). Mat and mat well: The mat well base (4), which is usually screed, must be completely level. Any unevenness in the mat well must be smoothed out before the mat is laid. In such cases we recommend using a liquid levelling compound. The frame anchor (5) is cast in the screed.
The emco installation frame 500 consists of angled profiles with mitred corners. The sturdy gusset plates supplied ensure a screw connection that is true to size. The scope of delivery includes wall anchors. The frame is supplied either ready for assembly or preassembled (e.g. in the case of frames with curved sections or several sections, etc.).
Installation guide:
The frame (1) must be flush with both
the screed (2) in the mat well and the
floor covering (3). Mat and mat well: The mat well base (4), which is usually screed, must be completely level. Any unevenness in the mat well must be smoothed out before the mat is laid. In such cases we recommend using a liquid levelling compound. The frame anchor (5) is cast in the screed.
The emco installation frame 500 consists of angled profiles with mitred corners. The sturdy gusset plates supplied ensure a screw connection that is true to size. The scope of delivery includes wall anchors. The frame is supplied either ready for assembly or preassembled (e.g. in the case of frames with curved sections or several sections, etc.).
Installation guide:
The frame (1) must be flush with both
the screed (2) in the mat well and the
floor covering (3). Mat and mat well: The mat well base (4), which is usually screed, must be completely level. Any unevenness in the mat well must be smoothed out before the mat is laid. In such cases we recommend using a liquid levelling compound. The frame anchor (5) is cast in the screed.