The Lobby refurbishment at 68 Harrington St provides a new sense of arrival for the building occupants, a natural warm toned ceramic tiled entry portal and feature perforated metallic finish ceiling is a bold continuous element connecting the exterior with the interior.
A generous stair leads up to the main lobby space, which is activated by a cafe with causal seating and a formal lobby waiting area.
The Lobby refurbishment at 68 Harrington St provides a new sense of arrival for the building occupants, a natural warm toned ceramic tiled entry portal and feature perforated metallic finish ceiling is a bold continuous element connecting the exterior with the interior.
A generous stair leads up to the main lobby space, which is activated by a cafe with causal seating and a formal lobby waiting area.
The Lobby refurbishment at 68 Harrington St provides a new sense of arrival for the building occupants, a natural warm toned ceramic tiled entry portal and feature perforated metallic finish ceiling is a bold continuous element connecting the exterior with the interior.
A generous stair leads up to the main lobby space, which is activated by a cafe with causal seating and a formal lobby waiting area.