CLIENT APPROACHED US WITH A TIGHT BUDGET FOR OFFICE ID RENOVATION WORKS AND A DATELINE FOR OFFICE OPENING CEREMONY. WE CAME UP WITH PRELIMINARY DESIGN PROPOSAL AND MANAGED TO FINALIZE THE RENOVATION COSTS AND APPOINTMENT WITHIN 2 WEEKS, DUE TO THE LIMITED TIME FRAME
TECHNICAL CHALLENGES MORE TOWARDS DURING ON SITE CONSTRUCTION, THAT WE ENCOUNTERED FROM THE EXISTING POOR WORKMANSHIP BY DEVELOPER THE WATER LEAKAGE FROM ROOF ABOVE TO DISTRIBUTION BOARD, WHICH CAUSES A PROBLEM DURING RENOVATION PERIOD. WE HAVE TO CLEAN AND SOLVED THE DAMAGED CAUSED AND WATER LEAKAGE FROM ROOF. AFTER ROOF SITE INSPECTION, IT WAS SUSPECTED THAT INSUFFICIENT WATER OUTLET PROVIDED AT ROOFTOP AND WATERPROOFING NOT DONE PROPERLY.
AS FOR INNOVATION, WOULD BE THE NEED TO INTEGRATE VERTICAL LANDSCAPE WITH WORKSTATION DESIGNATED AT THE4 CENTRAL OFFICE SPACE. BESIDES ALL THE UPS AND DOWNS OF CONSTRUCTION AND ADDITIONAL REQUIREMENTS BY CLIENT, WE MANAGED TO DELIVER THE PROJECT ON TIME. A HAPPY CLIENT IS GOOD ENOUGH FOR US
CLIENT APPROACHED US WITH A TIGHT BUDGET FOR OFFICE ID RENOVATION WORKS AND A DATELINE FOR OFFICE OPENING CEREMONY. WE CAME UP WITH PRELIMINARY DESIGN PROPOSAL AND MANAGED TO FINALIZE THE RENOVATION COSTS AND APPOINTMENT WITHIN 2 WEEKS, DUE TO THE LIMITED TIME FRAME
TECHNICAL CHALLENGES MORE TOWARDS DURING ON SITE CONSTRUCTION, THAT WE ENCOUNTERED FROM THE EXISTING POOR WORKMANSHIP BY DEVELOPER THE WATER LEAKAGE FROM ROOF ABOVE TO DISTRIBUTION BOARD, WHICH CAUSES A PROBLEM DURING RENOVATION PERIOD. WE HAVE TO CLEAN AND SOLVED THE DAMAGED CAUSED AND WATER LEAKAGE FROM ROOF. AFTER ROOF SITE INSPECTION, IT WAS SUSPECTED THAT INSUFFICIENT WATER OUTLET PROVIDED AT ROOFTOP AND WATERPROOFING NOT DONE PROPERLY.
AS FOR INNOVATION, WOULD BE THE NEED TO INTEGRATE VERTICAL LANDSCAPE WITH WORKSTATION DESIGNATED AT THE4 CENTRAL OFFICE SPACE. BESIDES ALL THE UPS AND DOWNS OF CONSTRUCTION AND ADDITIONAL REQUIREMENTS BY CLIENT, WE MANAGED TO DELIVER THE PROJECT ON TIME. A HAPPY CLIENT IS GOOD ENOUGH FOR US
CLIENT APPROACHED US WITH A TIGHT BUDGET FOR OFFICE ID RENOVATION WORKS AND A DATELINE FOR OFFICE OPENING CEREMONY. WE CAME UP WITH PRELIMINARY DESIGN PROPOSAL AND MANAGED TO FINALIZE THE RENOVATION COSTS AND APPOINTMENT WITHIN 2 WEEKS, DUE TO THE LIMITED TIME FRAME
TECHNICAL CHALLENGES MORE TOWARDS DURING ON SITE CONSTRUCTION, THAT WE ENCOUNTERED FROM THE EXISTING POOR WORKMANSHIP BY DEVELOPER THE WATER LEAKAGE FROM ROOF ABOVE TO DISTRIBUTION BOARD, WHICH CAUSES A PROBLEM DURING RENOVATION PERIOD. WE HAVE TO CLEAN AND SOLVED THE DAMAGED CAUSED AND WATER LEAKAGE FROM ROOF. AFTER ROOF SITE INSPECTION, IT WAS SUSPECTED THAT INSUFFICIENT WATER OUTLET PROVIDED AT ROOFTOP AND WATERPROOFING NOT DONE PROPERLY.
AS FOR INNOVATION, WOULD BE THE NEED TO INTEGRATE VERTICAL LANDSCAPE WITH WORKSTATION DESIGNATED AT THE4 CENTRAL OFFICE SPACE. BESIDES ALL THE UPS AND DOWNS OF CONSTRUCTION AND ADDITIONAL REQUIREMENTS BY CLIENT, WE MANAGED TO DELIVER THE PROJECT ON TIME. A HAPPY CLIENT IS GOOD ENOUGH FOR US