Projects
PROJECT
2 WEEKS AGO
Muara Angke’s renewal reimagines a coastal Jakarta community with sustainable design, climate resilience, and improved living conditions.
PROJECT
2 WEEKS AGO
NUS’s SDE1 and SDE3 set a new benchmark for campus sustainability, merging adaptive reuse with tropical design to achieve net-zero energy performance.
PROJECT
3 WEEKS AGO
Metro Manila has been notorious for its severe traffic congestion. It is as if immense gridlock has been ingrained into the capital’s identity.
PROJECT
3 WEEKS AGO
The most efficient method under DfMA today is prefabricated prefinished volumetric construction (PPVC). Also known as modular construction or unitised system, PPVC refers to the Lego-like assembly of 3-dimensional volumetric modules.
PROJECT
3 WEEKS AGO
The Malabar Hill Forest Trail is an attempt to explore the potential of eco-tourism in the middle of Mumbai’s dense built environment. Read more on Archify.
PROJECT
3 WEEKS AGO
Built in 1932, the Else Kuala Lumpur building was once Kuala Lumpur’s tallest, designed by Booty Edwards & Partners (now BEP Akitek).
PROJECT
3 WEEKS AGO
Pasig River Expressway (PAREX) is a 19.37-kilometre six-lane elevated expressway infrastructure that is soon to be built on top of the Pasig River, linking Laguna de Bay and Manila Bay.
PROJECT
3 WEEKS AGO
This pottery museum aims to be a place to showcase artisans’ work, retell the history of the village, and invite people to learn about the different materials and techniques used in pottery-making.
PROJECT
3 WEEKS AGO
The Rajbagh Silk Factory is one of the state government-owned properties that was severely affected by the floods that ravaged the northern Indian state of Jammu and Kashmir in 2014.
PROJECT
3 WEEKS AGO
Ng Teng Fong General Hospital and Jurong Community Hospital comprise a regional hospital, a community hospital as well as specialist outpatient clinics. The two hospitals operate symbiotically, with the regional hospital providing advanced medical and general support services to the community hospital and the latter receiving the former’s stabilised, recovering patients for stepdown care.