The Christchurch Hospital Acute Service Building was completed and opened in 2019.
Equus was heavily involved during the design process of the building with waterproofing systems specified throughout the building.
Systems:
Equus Soprema DuO Two Layer Membrane system on roofs and plant deck
Equus Soprema Duotherm Warm Roof with pedestals and pavers for balcony.
Keim Mineral Silicate Coatings over exterior.
Equus Soprema DeboFlex Tanking for underground waterproofing
Schomburg Aquafin 2K/M Plus cementitious waterproofing for water tanks.
Equus Chevaline Dexx membrane on internal floors
The Christchurch Hospital Acute Service Building was completed and opened in 2019.
Equus was heavily involved during the design process of the building with waterproofing systems specified throughout the building.
Systems:
Equus Soprema DuO Two Layer Membrane system on roofs and plant deck
Equus Soprema Duotherm Warm Roof with pedestals and pavers for balcony.
Keim Mineral Silicate Coatings over exterior.
Equus Soprema DeboFlex Tanking for underground waterproofing
Schomburg Aquafin 2K/M Plus cementitious waterproofing for water tanks.
Equus Chevaline Dexx membrane on internal floors
The Christchurch Hospital Acute Service Building was completed and opened in 2019.
Equus was heavily involved during the design process of the building with waterproofing systems specified throughout the building.
Systems:
Equus Soprema DuO Two Layer Membrane system on roofs and plant deck
Equus Soprema Duotherm Warm Roof with pedestals and pavers for balcony.
Keim Mineral Silicate Coatings over exterior.
Equus Soprema DeboFlex Tanking for underground waterproofing
Schomburg Aquafin 2K/M Plus cementitious waterproofing for water tanks.
Equus Chevaline Dexx membrane on internal floors