This 8,000 square meter property located in Tuba, Benguet consists of 36 duplex and 36 row type cluster units. Site development for this horizontal condominium includes concrete road network, underground drainage system, power distribution system, street lighting facilities, centralized interrelated water distribution system.
FDC prepared the detailed architectural and engineering design which included field surveys, preparation of complete design and contract documents. FDC also administered the construction of this project.
FDC also conducted Water Resources Study for the project site. The study had been the recipient of a National Engineering Excellence Award for Underground Water Resource Project given in December 3, 1996
This 8,000 square meter property located in Tuba, Benguet consists of 36 duplex and 36 row type cluster units. Site development for this horizontal condominium includes concrete road network, underground drainage system, power distribution system, street lighting facilities, centralized interrelated water distribution system.
FDC prepared the detailed architectural and engineering design which included field surveys, preparation of complete design and contract documents. FDC also administered the construction of this project.
FDC also conducted Water Resources Study for the project site. The study had been the recipient of a National Engineering Excellence Award for Underground Water Resource Project given in December 3, 1996
This 8,000 square meter property located in Tuba, Benguet consists of 36 duplex and 36 row type cluster units. Site development for this horizontal condominium includes concrete road network, underground drainage system, power distribution system, street lighting facilities, centralized interrelated water distribution system.
FDC prepared the detailed architectural and engineering design which included field surveys, preparation of complete design and contract documents. FDC also administered the construction of this project.
FDC also conducted Water Resources Study for the project site. The study had been the recipient of a National Engineering Excellence Award for Underground Water Resource Project given in December 3, 1996