ARCHIFYNOW > PROJECT > Filem Nasional Malaysia FINAS

Filem Nasional Malaysia (FINAS)

BY
fb icon
wa icon
email icon
FINAS Headquarters overlooking the North-South Expressway

In order to minimise ecological impact on the greenery at the site entrance, access into the building is done via a 300-metre-long overhead bridge in which greenery can still thrive underneath. The building is also raised onto a platform 7 metres above ground to allow growth of vegetation tucked at the perimeter of the platform. Large trees are then planted from the site entrance all the way to the building at ground level. The river running alongside is deepened to ensure that any water collected by the building does not impact the water capacity held by the river, in case of flooding or heavy rain. The project allows for 10 per cent landscape: large plants are allocated at the perimeter of the ground level while smaller species of shrubs and herbs are allocated within planter boxes on the platform levels.

The façade pixelation design minimises the penetration of solar heat gain by having more than 50 per cent of the façade in aluminium while a minimum amount of glazing is allocated just enough for the rooms in the layout.

For materials, the team intends to ensure that wood, brick and concrete products are sourced locally. In terms of design, it is intricate and specialised work since the building functions as a film-making and recording studio housing complicated machineries and acoustic spaces. Design of the building involves the cooperation of many specialists, including acoustic and audio visual consultants, as well as working closely under the supervision of the owner. One example of such intricacy is the sound stage design.

As a concept, this particular room is a ‘box-within-a-box’ in which there is a concrete room floating inside a bigger concrete room. This is where the film-recording is done and it adheres to a highly stringent acoustic requirement. The room where the film is recorded sits on a series of rubber stumps to ensure that sound and vibration does not transmit to the rest of the building.

PROJECT DATA

Project Name
Filem Nasional Malaysia (FINAS)

Location
Damansara Damai, Mukim Sg Buloh, Daerah Petaling, Selangor Darul Ehsan, Malaysia

Status
Piling construction stage

Expected Completion
Q1 2024

Site Area
5.14 acres

Gross Floor Area
19,598 square metres

Number of Rooms
156

Building Heights
75.65 metres

Client/Owner
Nilaitera Sdn Bhd

Architecture Firm
Hijjas Kasturi Associates Sdn Bhd

Principal Architect
Muhamad Aris Bin Abdullah

Main Contractor
MRCB Builders Sdn Bhd

Mechanical & Electrical Engineer
G&P M&E Sdn Bhd

Civil & Structural Engineer
Jurutera Perunding Meinhardt Sdn Bhd